November 1999, prior to the deck being built
       
     
     May 2, 2014
       
     
     November 1999, prior to the deck being built
       
     
     The day we decided to enclose our deck
       
     
     Akron, Ohio
       
     
     Our lower deck (a support posts needs to go through this deck)
       
     
     Enclosing Our Upper Deck
       
     
     Digging the post hole for the deck support
       
     
     Enclosing Our Upper Deck
       
     
     Construction Starts
       
     
     From 13 Feet 7" to 19 Feet 3"
       
     
     Deciding where to cut into the old deck
       
     
     Adding the Floor Joists
       
     
     Putting up the main support post
       
     
     The main support post in place
       
     
     Cut away part of old support wood
       
     
     Putting in the new support
       
     
     Everything lines up
       
     
     Support Post and Hole through Lower Deck
       
     
     Geeta checks out the work so far!
       
     
     Starting to look like a deck!
       
     
     Putting the second support bean into place
       
     
     Securing the floor joists
       
     
     Cutting out the floor
       
     
     Secured to the house
       
     
     Plastic covered plywood in case of rain
       
     
     First Day of Work Complete
       
     
     November 1999, prior to the deck being built
       
     
November 1999, prior to the deck being built
     May 2, 2014
       
     
May 2, 2014
     November 1999, prior to the deck being built
       
     
November 1999, prior to the deck being built
     The day we decided to enclose our deck
       
     
The day we decided to enclose our deck
     Akron, Ohio
       
     
Akron, Ohio
     Our lower deck (a support posts needs to go through this deck)
       
     
Our lower deck (a support posts needs to go through this deck)
     Enclosing Our Upper Deck
       
     
Enclosing Our Upper Deck
     Digging the post hole for the deck support
       
     
Digging the post hole for the deck support
     Enclosing Our Upper Deck
       
     
Enclosing Our Upper Deck
     Construction Starts
       
     
Construction Starts
     From 13 Feet 7" to 19 Feet 3"
       
     
From 13 Feet 7" to 19 Feet 3"
     Deciding where to cut into the old deck
       
     
Deciding where to cut into the old deck
     Adding the Floor Joists
       
     
Adding the Floor Joists
     Putting up the main support post
       
     
Putting up the main support post
     The main support post in place
       
     
The main support post in place
     Cut away part of old support wood
       
     
Cut away part of old support wood
     Putting in the new support
       
     
Putting in the new support
     Everything lines up
       
     
Everything lines up
     Support Post and Hole through Lower Deck
       
     
Support Post and Hole through Lower Deck
     Geeta checks out the work so far!
       
     
Geeta checks out the work so far!
     Starting to look like a deck!
       
     
Starting to look like a deck!
     Putting the second support bean into place
       
     
Putting the second support bean into place
     Securing the floor joists
       
     
Securing the floor joists
     Cutting out the floor
       
     
Cutting out the floor
     Secured to the house
       
     
Secured to the house
     Plastic covered plywood in case of rain
       
     
Plastic covered plywood in case of rain
     First Day of Work Complete
       
     
First Day of Work Complete